ONT 124 is caked in snow bringing up the rear of work extra 1734, operating a three man crew with the Jordan Spreader. Both wings are now fully extended having cleared the crossing with the train... (more)
Following a two day dumping adding to an already heavy winter snow load, ONR decided it was time to clean up the right of way right across the network. Here the flanger is seen biting into the ice... (more)